Production Planning Software

Stop Guessing.
Start Scheduling.
Ship on Time.

Plynt gives factory teams a visual production schedule they can build, adjust, and trust — live in under 30 minutes.

Live in <30 min
No IT team required

The cost of guessing

47min

Average schedule rebuild time

when one job slips in a spreadsheet

1 in 3

SMB manufacturers

lost a customer to a late delivery last year

6min

With Plynt

same schedule rebuild, drag and done

Your floor runs on real skill.
Your schedule shouldn't run on a prayer.

Excel and legacy ERP can't show you real capacity. They can't flag a conflict before it becomes a late shipment. They can't give your floor supervisor a live schedule they can actually trust. Plynt was built for exactly this gap — the factory that's too complex for spreadsheets, too lean for heavyweight MRP.

Visual Scheduling

See your entire floor at a glance — and change it in seconds.

Plynt's drag-and-drop Gantt shows every work order, every machine, every shift. When a job needs to move, drag it. Plynt automatically checks capacity, flags conflicts, and recalculates downstream impact before you commit the change.

  • Drag-and-drop rescheduling across machines and shifts
  • Real capacity view — no more overbooking a work center
  • Downstream job dependencies update automatically
  • Filter by machine, operator, customer, or due date
See Plynt in action
Schedule Board — Laser Cut
Week 31

Work center capacity

Laser Cut A 88%
Press Brake 102%
Welding Bay 61%

Jobs — drag to reschedule

WO-2841 In Progress

Bracket Assembly — Mon→Wed — 40 hrs

Aug 7
WO-2844 Conflict

Powder Coat — Press Brake overbooked

WO-2842 Queued

Frame Weld — Thu→Fri — 24 hrs

Aug 9
Conflict Alerts
2 active

WO-2844 — Press Brake overbooked

Tuesday Aug 6: 102% capacity. WO-2844 (Powder Coat, 6 hrs) conflicts with WO-2839 already scheduled.

WO-2847 — due date at risk

Downstream dependency on WO-2844 means Aug 9 ship date may slip 1–2 days. Customer: Hartwell MFG.

Suggested fix

Move WO-2844 to Wednesday

Press Brake drops to 74% Tue. WO-2847 ships Aug 9 as planned. No other jobs affected.

WO-2839 — conflict resolved

Moved to Laser Cut B. On track for Aug 5 completion.

Conflict Detection

Know about problems before your floor does.

Plynt watches your schedule in real time. The moment a job change creates an overbooked work center or threatens a ship date, you see it — and you see a suggested fix. No manual cross-referencing. No "I didn't know until it was too late."

  • Real-time overbook alerts — before the job starts, not after
  • One-click suggested fixes with full downstream impact preview
  • Due date risk tracking by customer and order priority
  • Email + SMS alerts when a ship date moves

Shop Floor View

Your floor team always knows what to run next.

Operators get a clean, mobile-first view of their assigned jobs in priority order — no login maze, no training required. When the schedule changes, their queue updates instantly. No more paper travelers or "what should I run next?" calls to the office.

  • Operator-specific job queue, always in priority order
  • Tap to log job start, pause, and completion — no paper
  • Progress feeds back to the planner's schedule in real time
  • Works on any phone or tablet — no app install needed
9:41 Plynt Floor

Good morning,

Marcus — Laser Cut A

Your jobs today

4 jobs
WO-2841 — NOW Active

Bracket Assembly

Due: 2:30 PM — Est. 3 hrs remaining

68% complete

WO-2843 — Next After 2:30 PM

Panel Cut

Est. 2 hrs — No special tooling

+ 2 more jobs queued for this shift

Pricing

One price. One facility.
Everything included.

No per-seat charges, no module fees. A flat monthly rate per facility — includes every feature, unlimited users, and live onboarding.

Starter

$149 /mo

per facility

Up to 5 work centers
Visual Gantt scheduling
Conflict detection
Unlimited users
Email support
Start free trial

Multi-Facility

Let's talk

Volume pricing for 2+ facilities

Everything in Production
Cross-facility schedule view
Dedicated account manager
Custom ERP integrations
SLA + uptime guarantee
Contact sales
14-day free trial
No credit card required
Live in under 30 minutes
Cancel any time

Your floor deserves a schedule
it can actually run on.

Join operations teams at small and mid-size factories who stopped guessing and started shipping on time. Set up in under 30 minutes — no IT, no consultants, no 6-month rollout.

14-day trial, no credit card required. Cancel any time.

Up and running in 30 min

Import your work orders via CSV or ERP connection. No onboarding sprint required.

Your whole team, no extra seats

Unlimited users per facility. Planners, supervisors, operators — everyone sees the schedule.

Built for this industry

Designed for discrete manufacturing — food, metals, furniture, electronics, plastics, consumer goods.